Lamington National Park part of the Gondwana Rainforest WHA with hidden gorges had numerous walking tracks closed due to cyclone damage.
Over the two year period Track & Trail worked to reopen trails on both the Green Mountain and Binna Burra portions of the park. Tracks repaired included the West Canungra Circuit, Box Forest Circuit, Coomera Circuit and the Lower Bellbird Circuit, all of these tracks are located in impressive sub-tropical rain forest in steep gorge country. Amongst the extensive repair works undertaken was the construction of twelve major river crossings using large stepping stones and the repair of a major landslip along with several smaller landslips.
Coomera Circuit Landslip
Before construction
During
After
Coomera Circuit Crossing 1
After
Switchback
Stepping stones
Box Forest Circuit Crossing 3
During

Winching a boulder into place

After

West Canungra Creek Circuit
Crossing 3

During

Giant boulder

Small Creek Crossing
Before

After

Gully
Completed work